2010 – Bridge repair

Ray Banham, workmaster, does the final inspection before reopening the bridge to traffic.

During the summer and fall of 2010, volunteers from the board proceeded to repair two of the bridges on the Tomifobia river, near km. 5 and 8. The addition of metal plates on each side made the structure much safer, so we could remove the old wooden guards rails.

 

This entry was posted in News. Bookmark the permalink.

Comments are closed.